I love checking off a to-do list! We have accomplished so many things that aren't even on the list, but here are the big things:
- Install Electric Outlet for Fridge Done!
- Clean Basement Carpet Done!
- Clean Basement Bathroom Done!
- Find Out Why Back Door is Leaking and Repair Hiring this one out!
- Polyurethane Dining Room Ceiling, Walls, and Floor Waiting on the above to be done.
- Pick Up Furniture from Clarkesville and Move It In Done!
- Meet Lowe's Appliance Installers Done!
- Pressure Wash Driveway (Old Part) Half-done. Pressure washer broke. :(
- Pressure Wash Porch Same as above. :(
- Buy Towels, Sheets, and Pillows Done!
- Repair Outside Back Faucet Better, but still leaking a bit...
- Find a Way to Get Our Cell Phones To Work!! (Maybe Transfer Service to Verizon) Done!
There are several new things to add. So here's the new to-do list:
- Meet the guy who will be building a retaining wall, and get an estimate for the total cost.
- Get a gutter guy, and have gutters repaired.
- Have the threshold repaired.
- Polyurethane the Dining Room ceiling, walls, and floor.
- Polyurethane the Temporary Master bump-out.
- Hang curtain panels in the Temporary Master.
- Polyurethane the ironing board cabinet.
- Find a shelf for the Basement Bathroom, and hang it for towel storage.
- Take chest, sofa, end tables, rugs, TVs, and lamps up. Possibly rent a truck next week.
- Measure Master Bedroom and write it all out on graft paper.
- Take Master Bedroom measurements to Lowe's so we can choose our cabinet and fixtures.
- Buy a Towel Storage Cabinet for the main floor bathroom.
- Paint my Granny's bed.
- Decide on light control for the Loft Bedroom. Shades? Or new panels that are room darkening?
- Make curtain for Basement Bedroom.
- Install window (or at least glass) for privacy in Loft Bedroom.
- Check bait stations, and add bait if necessary. Don't want another Mouse War!!
No comments:
Post a Comment